PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed Storm piping at the 2nd floor going into the 3rd floor Facing East.jpg Installing duct work at the 2nd floor Facing East.jpg Sprinkler branches at the 1st floor Facing North.jpg Sprinkler branches at the 1st floor Facing South-East.jpg Started installing the sprinkler branches at the 1st floor Facing West.jpg Installed storm piping at the 2nd floor going into the 3rd floor Facing Norh.jpg Started constructing the Skylight support enclosures Facing West.jpg Started installing conduit above the ceiling at the 4th floor Facing East.jpg